Brief
To provide a high yield bar for the purpose of servicing up to 13,000 people for a music concert to be held within a cricket ground. Within the brief we were to provide the full logistics, from the marquee and power, to the bar units, dispense equipment and on-site support throughout the concert. Service to the public and product quality were highest on the agenda.
What our Team Provided
Our team worked over two days to ensure that the bar was installed to the highest of standards. Due to the sensitivity of the ground, our team worked closely with the ground staff on site to ensure a smooth install with minimal disruption to the grass. On our list to install was the 120ft marquee, placed in a position to provide maximum potential of public access whilst not obscuring any access to viewing or the arena. Power was provided by a 65kva generator. Two 120ft bar units were installed allowing a pre pour system for faster service. Finally a number of large cooling units were installed to ensure integrity and quality of product. Final tests were carried out on the system by our technicians, prior to service.
Through the evening of the concert, two technicians were on site to make sure that systems were constantly operational ensuring maximum turnover.
Feedback
The service was a great success, with low queuing times and a quality product being served. It was mentioned in the local paper that the concert was a great success and that the bar was a major contributor to this.